![]() If the project is located in part or whole within the 100-year regulatory floodplain of a river, creek, drain or a body of water, a DEQ permit is required. Permits are issued for all of Tuscola County.ĭEPARTMENT OF ENVIROMENTAL QUALITY issues floodplain permits. Applications can be obtained at this office. A permit is required for all earth change activities which disturb one (1) or more acres of land, OR if the earth change is within 500 feet of a lake, stream, swamp, marsh, pond, county drain or any standing water. ![]() NUMBER. This can be obtained from your tax bill, Vassar City Hall or Equalization office at 98.ĭRIVEWAY/CULVERT PERMIT, this can be obtained from the City of Vassar at 98 or by clicking HERE. PROPERTY ADDRESS, may be obtained from your serving utility company, Detroit Edison (DTE) at 98 or Thumb Electric Cooperative at 80. All print for commercial and industrial must be signed by a State of Michigan registered architect/engineer. Prints must show the following: proposed footings, wall section, roof construction and floor plan. One (1) set will be returned to you along with your printed plan review. PLANS & SPECS, two (2) sets of plans must be submitted with application for plan review process. ![]() SITE PLAN, showing property lines, proposed project, existing buildings, ground elevations and the 100-year flood elevation, (if it applies). ZONING APPROVAL, this can be obtained from the zoning official from the City of Vassar at 98 or by clicking HERE. Prior to any permits being issued, SAFEbuilt needs to receive the following items: The City of Vassar authorizes Building Permits through SAFEbuilt.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |